Ananas CSM YiX1 Munar + MEM ErX + Fogin SiCC
by Jestersage
uploaded 2019-04-12
(updated 2021-05-24)
544 downloads /
33
points
VAB
stock+DLC ship
#Apollo #SaturnV #Munar #LEM #CSM

Built in the VAB in KSP version 1.11.2
- Breaking Ground DLC
- Making History DLC
- Squad (stock).
Root part is dockingPort3. (DLC REQUIRED)

Most recent updates
  • Updated RCS block on the CSM

Replica of / Inspiration

Apollo J Class (CSM and LM) + Lunar roving vehicle, on a Saturn V (United States)

Description

“Project Ananas” is Kerbal’s first Mun landing project, with the goal of sending Kerbalnauts onto Mun (and even Minmus) in the fastest “guaranteed” method. In order to make it in time for the New Year celebration, a lunar rendezvous is picked so a smaller rocket can be used.

The 3-man crew will transverse between Kerbin and Mun in the Ananas CSM outfited for Munar mission, and once arrived in Munar orbit, 2 Kerbalnauts will transfer to MEM to reach Munar surface. ErX have a newly designed descent stage so a folded Munar Roving Vehicle (Munar rover) can be folded and stowed within, as well as carrying scientific equipment. When it’s time to depart, the upper stage will separate from the descent stage and transverse back to Munar orbit to rendezvous with the CSM.

The entire package is launched atop the “Fogin SiCC”, which some claim is overbudget and overpower. However, Kerbodyne insist the size is necessary so Dessert Bureau can have the data they needed…

Rover release instruction

  • Locate the controller at the opposite bay of the rover bay, and press play
  • Flip the wheels around 180 degree so the wheels faced the ground, and extend them
  • Decouple the rover

Details

  • Type: VAB
  • Class: ship
  • Part Count: 138
  • Pure Stock
  • KSP: 1.11.2

Please Upvote Crafts – that will be greatly helpful!

If you like what you downloaded, feel free to comment in my craft catalog thread on the KSP Forums - Jestersage

swipe to switch images, tap to close
K
S
P