Description
1:drill 2:mine 3:refine 4:Dart/Spider 5:lander/antenna 8:drain
9:bay/antenna 0:Rhino/Spider
A recent conversation with Meltdown inspired me to revisit my original Gremlin design and refine
it. Thanks, Meltdown!
Most notably, Gremlin 2 is easier to redock with its mining base.
The four Hitchhikers have been replaced with simple accommodation & control for 6 kerbals. Total standby fuel capacity in the base has been expanded to better overlap operation while the fuel tanker delivers its load to orbit.
It is now also mounted atop my new Rhino interplanetary lifter.
Ascent should pitch over after 80 m/s and then raise AP to 75 km. Retain the Rhino S1 until just before AP is achieved.
Built in the VAB in KSP version 1.11.2.